EPS@ISEP | The European Project Semester (EPS) at ISEP


Report

Tile

Author(s):

Acknowledgement

Glossary

Abbreviation Description
EPS European Project Semester
ISEPInstituto Superior de Engenharia do Porto
USB Universal Serial Bus

1 Introduction

1.1 Presentation

1.2 Motivation

1.3 Problem

1.4 Objectives

1.5 Requirements

1.6 Functional Tests

1.7 Project Planning

1.8 Report Structure

Task Description
1
2
3
n

2 State of the Art

2.1 Introduction

Provide here the summary of this chapter.

2.2 Topic 1

2.3 Topic 2

2.4 Topic 3

2.5 Conclusion

Provide here the conclusions of this chapter and introduce the next chapter.

Based on this study of the state of the art, the team decided to adopt the following <specify here the architecture, technique(s), material(s), component(s)> … because <specify here the technical/scientific reasons>.

3 Project Management

3.1 Scope

Document the boundaries of your project. Document the product scope (the extent of what your project will produce) and the project Scope (summary of the work needed to produce it).

3.2 Time

Document the key milestones of your project, mapping key phases to reference deadlines.

3.3 Cost

Document the planned vs. effective costs of your project.

3.4 Quality

Document quality metrics that will apply to your project deliverables, associated thresholds and how they should be reviewed.

3.5 People

Identify key people related to the project and associated roles.

3.6 Communications

Document how your team will manage communications, describing communication channels, meetings, etc.

3.7 Risk

Identify key risks (product and project level), evaluate them and define how they should be handled (responses) and monitored.

3.8 Procurement

Document your procurement management strategy including make vs buy decisions, materials/services to be acquired, sources, costs, timings, etc.

3.9 Stakeholders Management

Define how you will manage stakeholders to keep them engaged.

3.10 Sprint Outcomes

Include the outcomes of all sprint reviews (what was the sprint backlog, completion status, planned capacity vs. achieved velocity).

3.11 Sprint Evaluations

Include the summary of all the sprint retrospectives, including any actions implemented as part of the team’s continuous improvement strategy.

3.12 Conclusion

Provide here the conclusions of this chapter and introduce the next chapter.

4 Marketing Plan

4.1 Introduction

Provide here the summary of this chapter.

4.2 Market Analysis

4.3 SWOT Analysis

4.4 Strategic Objectives

4.5 Segmentation

4.6 Strategy/Positioning

4.7 Adapted Marketing-Mix

4.8 Budget

4.9 Strategy Control

4.10 Conclusion

Provide here the conclusions of this chapter and introduce the next chapter.

Based on this market/economic analysis, the team decided to create <specify the type of product> intended for <specify the market niche> because … Consequently, the team decided to create a product with <specify the features>.

5 Eco-efficiency Measures for Sustainability

5.1 Introduction

Provide here the summary of this chapter.

5.2 Environmental

5.3 Economical

5.4 Social

5.5 Life Cycle Analysis

5.6 Conclusion

Provide here the conclusions of this chapter and introduce the next chapter.

Based on this sustainability analysis, the team chose <specify here the design, technique(s) material(s), component(s)> for the following environmental reasons…

6 Ethical and Deontological Concerns

6.1 Introduction

Provide here the summary of this chapter.

6.2 Engineering Ethics

6.3 Sales and Marketing Ethics

6.4 Environmental Ethics

6.5 Liability

6.6 Conclusion

Provide here the conclusions of this chapter and introduce the next chapter.

Based on this ethical and deontological analysis, the team chose <specify here the design, technique(s) material(s), component(s)> for the following ethical reasons…

7 Project Development

7.1 Introduction

Provide here the summary of this chapter.

7.2 Architecture

7.3 Components

7.4 Functionalities

7.5 Tests and Results

7.6 Conclusion

Provide here the conclusions of this chapter and introduce the next chapter.

8 Conclusions

8.1 Discussion

Provide here what was achieved (related with the initial objectives) and what is missing (related with the initial objectives) of the project.

8.2 Future Development

Provide here your recommendations for future work.

Bibliography

Will be added automatically by citing, in the body of the report, entries specified in BibTeX format and stored in the http://www.epswiki.dee.isep.ipp.pt/doku.php?id=refnotes:bib file

PS - If you have doubts on how to make citations, create captions, insert formulas, etc. visit this page with examples and select “Show pagesource” to see the source code.

QR Code
QR Code report (generated for current page)